EUROPE CLIMATE COMMAND

Climate Atlas

← Landing
CROWDSHIFT ATLAS

Europe climate exposure

HEATWAVE SCENARIO15:00 simulation
MapLibre + deck.gl starting…
SpainFranceBelgium GermanyPolandItalyUnited Kingdom London Paris BRUSSELSForge Summer Festival Berlin Madrid Rome
SIMULATION TIME15:00Peak exposure building
12:0014:0016:0018:0020:00
EVENT RISK82/100
CLIMATE WATCH

Active operational signals

Hazard + exposure + resource conflicts, not weather alone.

OFFICIAL CONTEXT

MeteoAlarm

ATOM
WHAT CHANGED?

Since 14:30

Apparent temperature+1.4°C
Main Stage crowd+320
Cooling demand+18%
Water A utilization74 → 118%
Operational risk71 → 82
✦ Two previously optional interventions are now recommended.
EVENT DIGITAL TWIN

Forge Summer Festival

Climate × Crowd × Resources

WWWW ++❄
High exposureResourcesFlow
RESOURCE MATRIX

Capacity gaps

ResourceAvailableRequiredGapStatus
Water throughput2,900 L/h4,600 L/h−1,700Critical
Cooling capacity620 ppl/h1,450 ppl/h−830Critical
Shade coverage72%90%−18%Gap
Medical teams23−1Gap
ACTIONCAST AI

Operational planner

Constraints + RiskGraph + retrieved guidance → feasible action plan.

Checking AI
Risk 82Attendees 4,800Budget €2,000Critical 14:00–17:30
RAG Relevant guidance is retrieved before the AI call. Environmental metrics are never invented by the LLM.
RANKED PLAN

Ready to optimize

—
Generate a plan to see ranked, budget-aware interventions with evidence and confidence.
RETRIEVED EVIDENCE

Why these actions?

Evidence appears after planning.

SCENARIO LAB

Build a response

Counterfactual simulation before committing resources.

LIVE RECOMPUTE
Open Hall C+830 people/hour cooling · €420
Temporary water stations+620 L/h each · €250
0
Shade canopies+6% coverage each · €400
0
Additional response teams+1 team · €300
0
Shift Kids Program to 18:00Moves activity into safest operating window · €0
Budget cap
€
PROJECTED RESULT

Before → After

CURRENT82HIGH
→
SCENARIO82HIGH
RISK ↓0 pts
SPEND€0
RESILIENCE62 → 62
BUDGET€2,000 left

Add interventions to see projected capacity changes.

UNCERTAINTY ENVELOPE

Expected vs range

71BEST
82EXPECTED
91WORST

Plans are evaluated against more than one plausible risk state instead of a single precise forecast.

✓
Safest operating window18:10–20:00 · projected risk 44
RESPONSE HUB

Operational tasks

Turn recommendations into accountable execution.

0/5 ACK
COMMUNICATIONS COMPILER

One state, every audience

OPERATIONS

Operations briefing

POST-EVENT INTELLIGENCE

Resilience report

Close the loop: what happened, what worked, and what to change next time.

RESILIENCE62 → 84+22 points
RISK AVOIDED

Operational impact

ACTIONCAST POSTMORTEM

What mattered most

SYSTEM ARCHITECTURE

From climate signal to operational action

Deterministic measurements and simulation surround the generative AI layer.

AUDITABLE
01Climate APIsWeather · AQI · warnings
→
02Context EngineCrowd · venue · resources
→
03RiskGraphDeterministic score
→
04Guidance RetrievalWHO · WMO · C3S
→
05ActionCast AIFeasible operations plan
→
06Scenario EngineBefore / after math
→
07Human OperatorApply · acknowledge
DATA PROVENANCE

Live integrations

GUIDANCE LIBRARY

Grounded planning

AUDIT TRAIL

Decision history

JUDGE TOUR